A SWMS (Safe Work Method Statement) is a document that describes high-risk work, the hazards that come with it, and the control measures used to keep people safe. It is one of the most common safety documents asked for on Australian construction and trade sites.
What is a SWMS for?
Under the model Work Health and Safety (WHS) Regulations, a SWMS must be prepared before high-risk construction work starts. Its job is simple: think through the task before it happens, write down what could go wrong, and set out how the risks will be controlled. It is a planning and communication tool as much as a compliance one. Everyone doing the work should understand it.
What does a SWMS contain?
A useful SWMS typically sets out:
- The high-risk construction work being carried out
- The hazards and risks associated with that work
- The control measures to be put in place, following the hierarchy of controls
- How the controls will be implemented, monitored and reviewed
- The plant, equipment, permits, licences and PPE involved
- Space for site details, responsible people and worker sign-on
What is the hierarchy of controls?
Good controls follow the hierarchy: eliminate the hazard first; if you can't, substitute, isolate or use engineering controls; then administrative controls (procedures, training, signage); and PPE last. Relying only on PPE is usually a sign the SWMS needs more work.
What is the difference between a SWMS, a JSA and an SWP?
People often mix these up. In short: a SWMS is specifically for high-risk construction work and is a legal requirement for it; a JSA (Job Safety Analysis) is a similar risk-assessment tool used more broadly; and a Safe Work Procedure (or SOP) is a step-by-step guide for operating a piece of plant or doing a routine task. We break the difference down in SWMS vs JSA.
Who prepares and signs a SWMS?
The business doing the high-risk work is responsible for the SWMS, and it should be developed with the workers who actually do the task. They know the hazards best. Before work starts, the crew is briefed and signs on to confirm they understand it. It should be reviewed if the work, site or conditions change, or after an incident.
How do you get a SWMS?
You can write one from scratch, but most trades start from a professionally written template and adapt it to the job. Our SWMS are written for your state and delivered as editable Word files. Browse trade packs (every SWMS for your trade, plus free SOPs) or grab a single individual SWMS.
Get your SWMS sorted in minutes
State-specific, editable templates built by WHS professionals. Instant download.
This guide is general information, not legal or safety advice, and does not guarantee compliance. Laws and site conditions vary, so always check your state regulator and have documents reviewed by a competent person.