Arborist and Tree Work JSA

Master

Job Safety Analysis, national version

$39.99

National version · editable Word doc

What this is

A Job Safety Analysis covering Arborist and Tree Work as a whole, rather than a single task. It breaks the work into 9 steps, including mobilise to site and set up the work area, identify powerlines and services and climb or set up the EWP, and sets out the hazards, the risk rating and the control measures for each one.

It's an editable Word document, so you add your company and site details, check the hazards and controls against the actual job, and get your crew to sign on before work starts. New to it? See how a JSA differs from a SWMS.

The steps this JSA covers

  1. 1 Plan, prepare and confirm competency
  2. 2 Mobilise to site and set up the work area
  3. 3 Identify powerlines and services
  4. 4 Set up power and inspect tools
  5. 5 Climb or set up the EWP
  6. 6 Cut and rig aloft
  7. 7 Operate chipper and ground crew
  8. 8 Fell trees
  9. 9 Pack down, clean up and demobilise

The document sets out the hazards, a risk rating and the control measures for each of these steps, along with the residual risk once the controls are in place.

Hazards it addresses

Untrained or unauthorised workersElectric shockFalls from heightFalling objects and struck-byManual handling strainCuts and lacerationsTraffic and pedestriansEmergency response delaysLifting gear and load failure

Who this is for

Used across Arborist and Tree Work. Suits contractors, subcontractors and crews who carry out Arborist and Tree Work as part of their work.

When you'll be asked for one

Head contractors, builders and clients commonly ask for a JSA before you start on site. It is also worth having on your own jobs, as a record that the task was worked through with the crew before anyone started.

What's in the document

Editable Word file with fields for your company, site address, date, personnel and crew sign-on. The steps, hazards, risk ratings and controls are already drafted, so you review and adjust rather than start from a blank page.

Used across these trades

Arborist and Tree Work

Common questions

Is a JSA the same as a SWMS for Arborist and Tree Work?

No. A SWMS is required for high-risk construction work under the WHS Regulations. Arborist and Tree Work does not usually fall into those categories on its own, though principal contractors and builders often ask for documentation before you get on site.

What does this Arborist and Tree Work JSA cover?

It works through 9 job steps, including mobilise to site and set up the work area, identify powerlines and services, climb or set up the EWP and cut and rig aloft. Each step lists the hazards for that step, an initial risk rating, the control measures and the residual risk once those controls are in place.

Is this JSA state-specific?

JSAs are national. Our SWMS are written per state because the Act and regulator differ, but a JSA is a risk-assessment tool rather than a state-legislated document.

Can I edit it and add my logo?

It is an editable Word document. Add your company details and logo, then adjust the steps, hazards and controls to match the actual Arborist and Tree Work job in front of you.

Who fills it out and who signs it?

Whoever is running the job completes the site-specific fields and reviews the controls against the actual conditions. Everyone doing the work signs on before it starts, and the document includes a worker sign-on sheet for that.

$39.99

National version · editable Word doc

GST-inclusive. Instant download. Tax invoice provided.


Editable .docx, add your logo and details
Task-by-task hazards and controls
Instant download after payment

Need help making the JSA yours?

We can add your logo, company name, and business details to your JSA pack. Email us for a quote.