Carpentry SWMS Pack
Complete SWMS pack for your trade
Built by safety specialists — written for your state
Every document is built and audited by WHS professionals. Each state version references the correct Act, regulator, and requirements — Victoria gets the OHS Act and WorkSafe Victoria, NSW gets the WHS Act and SafeWork NSW. Different laws, different documents.
Master SWMS
Full ScopeIncludes one overriding Master SWMS covering the full trade scope, plus task-specific SWMS for detailed work.
All carpentry works - framing and trusses, lock-up and fix-out, cladding, decking, stairs and handrails, formwork carpentry, cabinetry and door/window installation. This single SWMS covers the full carpentry scope for contractors who do not require task-specific documents.
Task-Specific SWMS (13)
Detailed SWMS for specific tasks within the carpentry scope.
Awareness-level controls for workers who may encounter asbestos-containing materials (ACM) - identifying likely ACM, using the asbestos register, and responding to suspected or disturbed material. This SWMS does not authorise removal.
Installation of kitchen, bathroom and joinery cabinets - carcasses, benchtops, wall units and appliances interface.
Installation of external wall cladding - fibre cement, weatherboard, metal and composite panels.
Removal and installation of facade cladding panels using industrial rope access methods.
Removal and installation of facade cladding from suspended powered scaffolds (swing stages).
Construction of timber and composite decks - footings, subframe, decking installation and finishing.
Erection of timber and steel wall frames and roof trusses - standing frames, bracing, truss installation and tie-down.
Installation of handrails and balustrades to stairs, landings, ramps and decks - timber, steel and glass infill systems.
Lock-up and fixing stage carpentry - doors, windows, architraves, skirting, linings and external trims.
Construction of raised timber floor systems - bearers, joists, flooring sheets and subfloor work.
Installation of timber and prefabricated stairs - stringers, treads, balustrades and temporary edge protection.
Installation of solid timber and engineered floors - subfloor prep, laying, nailing/gluing and finishing interface.
Landscaping work in occupied homes - gardens, structures and maintenance with residents on site.
Carpentry Pack
14 SWMS templates
$699.86 if purchased individually Save $499.87
GST-inclusive. Instant download. Tax invoice provided.
Safe Operating Procedures for equipment and tasks — free with this pack
- Angle Grinder
- Drop Saw - Compound Mitre Saw
- Circular Saw
- Reciprocating Saw
- Abrasive Cut-off - Demolition Saw (Quick-Cut)
- Drill - Hammer Drill
- Impact Wrench - Driver
- Jackhammer - Breaker
- Nail Gun - Powder-Actuated Tool
- Bench Grinder
- Portable Generator
- Air Compressor
- Wet-Dry Vacuum & Dust Extraction (H-Class)
- Extension Leads, RCDs and Portable Power
- Step Ladder - Extension Ladder
- Mobile Scaffold (Tower)
- Elevated Work Platform (EWP) — Scissor Lift
- Elevated Work Platform (EWP) — Boom Lift
- Trestles and Planks
- Manual Handling - Team Lifting
- Pallet Jack
- Chain Block - Lever Hoist
- Slings, Shackles and Lifting Gear
- Crane Lift - Rigging (Dogging)
- Hazardous Substance Handling & Storage
- Fuel Storage and Refuelling
- Spill Response & Spill Kit Use
- Fire Extinguisher Use
- First Aid Kit Use & Restocking
- Vehicle - Ute Pre-Start and Safe Driving
Scroll to see all 30 SOPs