Data and Communications SWMS Pack
Complete SWMS pack for your trade
Built by safety specialists — written for your state
Every document is built and audited by WHS professionals. Each state version references the correct Act, regulator, and requirements — Victoria gets the OHS Act and WorkSafe Victoria, NSW gets the WHS Act and SafeWork NSW. Different laws, different documents.
Master SWMS
Full ScopeIncludes one overriding Master SWMS covering the full trade scope, plus task-specific SWMS for detailed work.
All data and communications works - structured copper and fibre cabling, pit and pipe, cable hauling, comms room and rack fit-outs, wireless equipment and works in occupied premises. This single SWMS covers the full data and communications scope for contractors who do not require task-specific documents.
Task-Specific SWMS (14)
Detailed SWMS for specific tasks within the data and communications scope.
Hauling and pulling of cables through conduits, ducts, trays and risers using hand and winch methods.
Fit-out of communications rooms and data cabinets - rack assembly and securing, equipment installation, cable management, power interfaces and commissioning.
Entry into and work within confined spaces (pits, tanks, chambers, pipes, vaults) including identification, permits, atmosphere control, entry, the task and rescue.
Installation of data, communications and fibre optic cabling - ceiling/wall pathways, risers, pits, racks and terminations.
Operation of elevated work platforms (boom lifts, cherrypickers, scissor lifts) for work at height, including set-up, elevated work and stowing.
Excavation in proximity to underground and overhead assets (power, gas, water, sewer, fuel, comms), including locating, potholing, exposing, supporting and reinstating services.
Selection and use of ladders, platform ladders, podium steps and mobile access platforms for short-duration work at height.
Locating and marking underground services using electromagnetic (EML) and ground-penetrating radar (GPR) methods prior to excavation.
Work with plant, equipment or materials near overhead electric lines, including planning, exclusion zones, spotters and emergency response to line contact.
Installation of telecommunications pits and conduits - excavation, boring interfaces, conduit laying, pit placement, haul rope installation and reinstatement.
Electrical and services work within building risers and shafts - cabling, equipment and penetrations.
Excavation of trenches for services, drainage and foundations, including service location, excavation, ground support, entry, backfill and reinstatement.
Landscaping work in occupied homes - gardens, structures and maintenance with residents on site.
Work within residential and commercial roof spaces - cabling, ducting, equipment and inspections.
Data and Communications Pack
15 SWMS templates
$749.85 if purchased individually Save $499.86
GST-inclusive. Instant download. Tax invoice provided.
Safe Operating Procedures for equipment and tasks — free with this pack
- Core Drilling Rig (Wet & Dry)
- Vacuum Excavation - Hydro-Excavation Unit
- Angle Grinder
- Drop Saw - Compound Mitre Saw
- Circular Saw
- Reciprocating Saw
- Abrasive Cut-off - Demolition Saw (Quick-Cut)
- Drill - Hammer Drill
- Impact Wrench - Driver
- Jackhammer - Breaker
- Nail Gun - Powder-Actuated Tool
- Bench Grinder
- Portable Generator
- Air Compressor
- Wet-Dry Vacuum & Dust Extraction (H-Class)
- Extension Leads, RCDs and Portable Power
- Step Ladder - Extension Ladder
- Mobile Scaffold (Tower)
- Elevated Work Platform (EWP) — Scissor Lift
- Elevated Work Platform (EWP) — Boom Lift
- Trestles and Planks
- Manual Handling - Team Lifting
- Pallet Jack
- Chain Block - Lever Hoist
- Slings, Shackles and Lifting Gear
- Crane Lift - Rigging (Dogging)
- Hazardous Substance Handling & Storage
- Fuel Storage and Refuelling
- Spill Response & Spill Kit Use
- Fire Extinguisher Use
- First Aid Kit Use & Restocking
- Vehicle - Ute Pre-Start and Safe Driving
Scroll to see all 32 SOPs