Roofing SWMS Pack
Complete SWMS pack for your trade
Built by safety specialists — written for your state
Every document is built and audited by WHS professionals. Each state version references the correct Act, regulator, and requirements — Victoria gets the OHS Act and WorkSafe Victoria, NSW gets the WHS Act and SafeWork NSW. Different laws, different documents.
Master SWMS
Full ScopeIncludes one overriding Master SWMS covering the full trade scope, plus task-specific SWMS for detailed work.
All roofing works - new metal and tile roofing, re-roofing and removal, gutters and fascia, skylights, roof penetrations and roof space work. This single SWMS covers the full roofing scope for contractors who do not require task-specific documents.
Task-Specific SWMS (11)
Detailed SWMS for specific tasks within the roofing scope.
Awareness-level controls for workers who may encounter asbestos-containing materials (ACM) - identifying likely ACM, using the asbestos register, and responding to suspected or disturbed material. This SWMS does not authorise removal.
Work with plant, equipment or materials near overhead electric lines, including planning, exclusion zones, spotters and emergency response to line contact.
Preparation and coating/encapsulation of asbestos-cement roofs - the roof is coated in place, never abraded or pressure-washed.
Installation, alteration and removal of temporary roof edge protection (guardrail) systems on new and existing roofs.
General work on roofs - inspections, repairs, maintenance and minor installations on metal and tile roofs.
Installation of metal roof sheeting - safety mesh, insulation, sheet laying, flashings and gutters.
Installation and repair of tiled roofs - battens, sarking, tile loading, laying, cutting, ridge work and bedding/pointing.
Removal of existing roof cladding (sheet or tile) and battens, including fragile and ACM roof identification, work at height, debris handling and weatherproofing.
Installation of skylights, roof windows and roof ventilators - cutting openings, flashing and sealing on existing roofs.
Landscaping work in occupied homes - gardens, structures and maintenance with residents on site.
Work within residential and commercial roof spaces - cabling, ducting, equipment and inspections.
Roofing Pack
12 SWMS templates
$599.88 if purchased individually Save $399.89
GST-inclusive. Instant download. Tax invoice provided.
Safe Operating Procedures for equipment and tasks — free with this pack
- Angle Grinder
- Drop Saw - Compound Mitre Saw
- Circular Saw
- Reciprocating Saw
- Abrasive Cut-off - Demolition Saw (Quick-Cut)
- Drill - Hammer Drill
- Impact Wrench - Driver
- Jackhammer - Breaker
- Nail Gun - Powder-Actuated Tool
- Bench Grinder
- Portable Generator
- Air Compressor
- Wet-Dry Vacuum & Dust Extraction (H-Class)
- Extension Leads, RCDs and Portable Power
- Step Ladder - Extension Ladder
- Mobile Scaffold (Tower)
- Elevated Work Platform (EWP) — Scissor Lift
- Elevated Work Platform (EWP) — Boom Lift
- Trestles and Planks
- Manual Handling - Team Lifting
- Pallet Jack
- Chain Block - Lever Hoist
- Slings, Shackles and Lifting Gear
- Crane Lift - Rigging (Dogging)
- Hazardous Substance Handling & Storage
- Fuel Storage and Refuelling
- Spill Response & Spill Kit Use
- Fire Extinguisher Use
- First Aid Kit Use & Restocking
- Vehicle - Ute Pre-Start and Safe Driving
Scroll to see all 30 SOPs