Scaffolding SWMS Pack
Complete SWMS pack for your trade
Built by safety specialists — written for your state
Every document is built and audited by WHS professionals. Each state version references the correct Act, regulator, and requirements — Victoria gets the OHS Act and WorkSafe Victoria, NSW gets the WHS Act and SafeWork NSW. Different laws, different documents.
Master SWMS
Full ScopeIncludes one overriding Master SWMS covering the full trade scope, plus task-specific SWMS for detailed work.
All scaffolding works - fixed modular and tube-and-coupler scaffold erection, alteration and dismantling, mobile towers, suspended (swing stage) scaffolds, inspections and handover, and loading and transport of scaffold gear. This single SWMS covers the full scaffolding scope for contractors who do not require task-specific documents.
Task-Specific SWMS (9)
Detailed SWMS for specific tasks within the scaffolding scope.
Operation of elevated work platforms (boom lifts, cherrypickers, scissor lifts) for work at height, including set-up, elevated work and stowing.
Erection, alteration and dismantling of fixed (modular/tube-and-coupler) scaffold, including base preparation, progressive erection, tying and handover.
Rigging and installation of suspended powered scaffolds (swing stages), including roof rigs, counterweights, hoists and commissioning.
Assembly, use, relocation and dismantling of mobile (aluminium tower) scaffolds, including castors, outriggers, internal ladder access and platform work.
Work with plant, equipment or materials near overhead electric lines, including planning, exclusion zones, spotters and emergency response to line contact.
Installation, alteration and removal of temporary roof edge protection (guardrail) systems on new and existing roofs.
Loading, unloading, transport and site distribution of scaffold components - truck loading and load restraint, crane and vehicle-loading-crane lifts, forklift handling, manual handling, stacking and storage.
Working from a commissioned suspended powered scaffold (swing stage) for facade and building works.
Use of a crane-lifted workbox to position personnel for tasks where other access methods are not reasonably practicable.
Scaffolding Pack
10 SWMS templates
$499.90 if purchased individually Save $299.91
GST-inclusive. Instant download. Tax invoice provided.
Safe Operating Procedures for equipment and tasks — free with this pack
- Angle Grinder
- Drop Saw - Compound Mitre Saw
- Circular Saw
- Reciprocating Saw
- Abrasive Cut-off - Demolition Saw (Quick-Cut)
- Drill - Hammer Drill
- Impact Wrench - Driver
- Jackhammer - Breaker
- Nail Gun - Powder-Actuated Tool
- Bench Grinder
- Portable Generator
- Air Compressor
- Wet-Dry Vacuum & Dust Extraction (H-Class)
- Extension Leads, RCDs and Portable Power
- Step Ladder - Extension Ladder
- Mobile Scaffold (Tower)
- Elevated Work Platform (EWP) — Scissor Lift
- Elevated Work Platform (EWP) — Boom Lift
- Trestles and Planks
- Manual Handling - Team Lifting
- Pallet Jack
- Chain Block - Lever Hoist
- Slings, Shackles and Lifting Gear
- Crane Lift - Rigging (Dogging)
- Hazardous Substance Handling & Storage
- Fuel Storage and Refuelling
- Spill Response & Spill Kit Use
- Fire Extinguisher Use
- First Aid Kit Use & Restocking
- Vehicle - Ute Pre-Start and Safe Driving
Scroll to see all 30 SOPs